Quick Answer
Already have a solar quote? Get a free independent audit. The optimal configuration depends on your actual consumption, roof orientation, battery needs, and choosing the right export tariff.
What we check
Costa Solar Guide provides a practical sanity check on solar panel quotations for property owners in Málaga and the Costa del Sol. We evaluate the key operational details of your quote:
- Sizing suitability: Does the quoted kWp capacity align with your annual electricity consumption (kWh)?
- Inverter capabilities: Is the inverter hybrid-ready (for future batteries) and correctly rated?
- Battery specifications: Is the quoted storage capacity nominal or usable?
- Paperwork and permits: Are municipal licenses, tax discounts, and industry registrations (boletín/CIE) explicitly handled?
- Post-install savings: Have the import/export tariff settings been balanced for peak savings?

What we do not do
Our review is a practical sanity check based on experience, not a technical engineering design.
Common quote problems we identify
When auditing quotes, we frequently identify missing or misleading items, such as:
- Quotes that fail to specify the exact brand and model of panels or inverters.
- Vague assertions about battery backup capability that exclude the required gateway hardware and wiring costs.
- Promises of Junta de Andalucía subsidies that fail to explain the current backlog or application criteria.
- High-priced installations that do not include final registration with the regional industry delegation.
Why battery backup claims need checking
A battery will not keep your appliances running during a grid outage unless your system is configured with an automatic transfer switch or backup box. Many sales pitches gloss over this detail. If backup capability is important, the quote must list the backup box, critical load wiring, and specify which circuits (refrigerator, lights, internet) will remain active.
Why legalisation and tariff audits are critical
Your panels must be legalised to qualify for export compensation and tax deductions. Ensure your quote details the final registration certificate (CIE). Furthermore, once the system goes live, switching to a competitive tariff with a virtual battery rolling credit can double your monthly savings compared to staying on a standard supplier plan.
